• Background-1

100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

We often stay with the principle "Quality Very first, Prestige Supreme". We have been fully committed to supplying our consumers with competitively priced high-quality goods, prompt delivery and skilled provider for Injection Molded Parts , Injection Molding In Automotive Industry , Uhmwpe Injection Molding , We welcome you to definitely inquire us by simply call or mail and hope to develop a prosperous and cooperative connection.
100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding Detail:

case4

Ground Box Mould

Export Country:
India

Completion Time:
1 Month

Tag: Injection Mould

Challange

There are many angle lifters applied for the mould and space for some of the lifters were very tight. But the customer has to get the features as required.

Solutions

Have the mechanism changed for these features.

Product Application Field

Industrial communication cable tray

Main Challenges

The position of the winding reel in the middle of the product has a thin wall thickness and is very dense. EDM processing is very complex, and the mold is very easy to break. There are many defective products and serious material shortage in injection molding. For the wall thickness problem, first, we replaced the product material and used PC + ABS material, which increases the willfulness of the product and is not easy to break; Second mold core material is treated with S136 heat treatment to increase the life of strength die. Second, we make the middle part into replacement inserts, which can not only solve the problems of mold damage and repair caused by improper injection molding operation, but also solve the problem of gas trapping and material shortage of products.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PC+ABS
Project Leader: Ken Yeo

Key Words

PC+ABS, Air Trap, Shrinkage, Distortion


Product detail pictures:

100% Original Factory Manufacturing Of Plastic -
 Cable slack tray – Uni-Moulding detail pictures


Related Product Guide:

We insist over the principle of development of 'High top quality, Performance, Sincerity and Down-to-earth working approach' to supply you with exceptional services of processing for 100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding , The product will supply to all over the world, such as: Japan , Georgia , Poland , With the development and enlargement of mass clients abroad, now we've set up cooperative relationships with many major brands. We've our own factory and also have many reliable and well-cooperated factories in the field. Adhering to the "quality first, customer first, We are provideing high-quality, low-cost items and first-class service to customers. We sincerely hope to establish business relationship with customers from all over the world on the basis of quality, mutually benefit. We welcome OEM projects and designs.
  • The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.
    5 Stars By Rose from Finland - 2017.07.07 13:00
    In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Doreen from Atlanta - 2017.12.09 14:01
    Write your message here and send it to us