• Background-1

100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

Fast and great quotations, informed advisers to help you choose the correct solution that suits all your requirements, a short creation time, responsible top quality manage and distinct providers for paying and shipping affairs for Injection Mold Inc , Rim Injection Molding , Practical Injection Molding , We welcome shoppers, enterprise associations and buddies from all areas of your environment to speak to us and request cooperation for mutual gains.
100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding Detail:

case4

Ground Box Mould

Export Country:
India

Completion Time:
1 Month

Tag: Injection Mould

Challange

There are many angle lifters applied for the mould and space for some of the lifters were very tight. But the customer has to get the features as required.

Solutions

Have the mechanism changed for these features.

Product Application Field

Industrial communication cable tray

Main Challenges

The position of the winding reel in the middle of the product has a thin wall thickness and is very dense. EDM processing is very complex, and the mold is very easy to break. There are many defective products and serious material shortage in injection molding. For the wall thickness problem, first, we replaced the product material and used PC + ABS material, which increases the willfulness of the product and is not easy to break; Second mold core material is treated with S136 heat treatment to increase the life of strength die. Second, we make the middle part into replacement inserts, which can not only solve the problems of mold damage and repair caused by improper injection molding operation, but also solve the problem of gas trapping and material shortage of products.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PC+ABS
Project Leader: Ken Yeo

Key Words

PC+ABS, Air Trap, Shrinkage, Distortion


Product detail pictures:

100% Original Factory Manufacturing Of Plastic -
 Cable slack tray – Uni-Moulding detail pictures


Related Product Guide:

We'll make each hard work to become excellent and excellent, and speed up our measures for standing from the rank of intercontinental top-grade and high-tech enterprises for 100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding , The product will supply to all over the world, such as: Angola , Romania , Turkmenistan , we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we've gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
  • The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Julia from South Africa - 2017.11.20 15:58
    The factory can meet continuously developing economic and market needs, so that their products are widely recognized and trusted, and that's why we chose this company.
    5 Stars By May from Turkey - 2017.06.29 18:55
    Write your message here and send it to us