Adhering for the theory of "quality, services, performance and growth", we have received trusts and praises from domestic and worldwide shopper for Weld Line In Injection Molding , Abs Plastic Injection Molding , Injection Moulds For Beginners , With the development of society and economy, our company will keep a tenet of "Focus on trust, quality the first", moreover, we expect to create a glorious future with every customer.
18 Years Factory Plastic Molding Industry - Cable slack tray – Uni-Moulding Detail:

case4

Ground Box Mould

Export Country:
India

Completion Time:
1 Month

Tag: Injection Mould

Challange

There are many angle lifters applied for the mould and space for some of the lifters were very tight. But the customer has to get the features as required.

Solutions

Have the mechanism changed for these features.

Product Application Field

Industrial communication cable tray

Main Challenges

The position of the winding reel in the middle of the product has a thin wall thickness and is very dense. EDM processing is very complex, and the mold is very easy to break. There are many defective products and serious material shortage in injection molding. For the wall thickness problem, first, we replaced the product material and used PC + ABS material, which increases the willfulness of the product and is not easy to break; Second mold core material is treated with S136 heat treatment to increase the life of strength die. Second, we make the middle part into replacement inserts, which can not only solve the problems of mold damage and repair caused by improper injection molding operation, but also solve the problem of gas trapping and material shortage of products.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PC+ABS
Project Leader: Ken Yeo

Key Words

PC+ABS, Air Trap, Shrinkage, Distortion


Product detail pictures:

18 Years Factory Plastic Molding Industry -
 Cable slack tray – Uni-Moulding detail pictures


Related Product Guide:

We have been also concentrating on enhancing the things management and QC method so that we could preserve terrific edge inside the fiercely-competitive enterprise for 18 Years Factory Plastic Molding Industry - Cable slack tray – Uni-Moulding , The product will supply to all over the world, such as: Doha , Plymouth , United Arab Emirates , In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Moira from Swansea - 2017.11.12 12:31
    We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Marguerite from Jamaica - 2018.06.30 17:29
    Write your message here and send it to us