• Background-1

Rapid Delivery for Water Assisted Injection Molding - Office Chair Back – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

Our personnel are generally in the spirit of "continuous improvement and excellence", and together with the outstanding top quality merchandise, favorable price tag and fantastic after-sales solutions, we try to gain every single customer's rely on for Twin Shot Injection Moulding , Structural Foam Injection Molding , Model Flow Analysis , To learn more about what we can do for you, contact us at any time. We look forward to establishing good and long-term business relationships with you.
Rapid Delivery for Water Assisted Injection Molding - Office Chair Back – Uni-Moulding Detail:

case6

Office Chair Back

Export Country:
England

Completion Time:
1 Month

Tag: Office Chair Back

Challange

The part line is curved, not straight and not ejection pins applied .

Solutions

It highly depends on the mold maker’s skill and knowledge. We are lucky to have our own mold makers who fulfills the job over 20 years.

Product Application Field

Office chair,Office Supplies

Main Challenges

PVC corrosion mold: S136 heat treatment is adopted to increase the hardness and corrosion resistance of the die;

PP chair keel shrinkage: Due to the thick wall thickness of chair keel, PP material is easy to shrink, we first thinned the wall thickness of the keel, and then we added keel ribs to increase the strength of the product. In fact, we add a certain proportion of glass fiber to PP material to increase the strength effect, and appropriately add a certain amount of calcium sulfate and toughening agent to ensure that the product is not easy to shrink and the fluidity of the material can maintain the original properties.

Chair assembly coordination: Before developing the mold, we first processed some samples with a 3D printer, assembled and adapted them, and found out the corresponding problem points, so as to change the design scheme. Before the mold design, we also conducted mold flow analysis on the product, and have used SolidWorks to test the assembly and adaptation details of the product.

The customer designed to use ABS at the wear position of the Department. After test, discussion and negotiation with the customer, the ABS material was replaced with POM material, so that the product has better wear resistance and ensures the service life of plastic office chairs. It has been recognized by customers.
Material replacement:

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1300*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 7 pcs
Mold Quantity: 6 sets
Number of Processed Sliders: 12 pcs
Mold Material: S136, NAK80, P20, 718, 45#, etc.
Part Material: PVC, PP+GF, POM
Project Leader: Ken Yeo

Key Words

PVC, PP+GF, Air Trap, Shrinkage, SolidWorks


Product detail pictures:

Rapid Delivery for Water Assisted Injection Molding -
 Office Chair Back – Uni-Moulding detail pictures


Related Product Guide:

We always get the job done being a tangible workforce making sure that we can easily give you the very best quality as well as finest selling price for Rapid Delivery for Water Assisted Injection Molding - Office Chair Back – Uni-Moulding , The product will supply to all over the world, such as: Georgia , Norwegian , Seattle , Many kinds of different solutions are available for you to choose, you can do one-stop shopping here. And customized orders are acceptable. Real business is to get win-win situation, if possible, we would like to deliver more support for customers. Welcome all nice buyers communicate details of solutions with us!!
  • The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Bernice from Poland - 2018.08.12 12:27
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Nicci Hackner from San Diego - 2018.05.15 10:52
    Write your message here and send it to us