The company upholds the philosophy of "Be No.1 in quality, be rooted on credit and trustworthiness for growth", will continue to serve old and new customers from home and overseas whole-heatedly for Pvc Injection Molding , Injection Molding Usa , Lsr Injection Molding , "Making the Products of High Quality" is the eternal goal of our company. We make unremitting efforts to realize the goal of "We Will Always Keep in Pace with the Time".
Short Lead Time for Plastic Moulding Machine Manufacturers - Office Chair Back – Uni-Moulding Detail:

case6

Office Chair Back

Export Country:
England

Completion Time:
1 Month

Tag: Office Chair Back

Challange

The part line is curved, not straight and not ejection pins applied .

Solutions

It highly depends on the mold maker’s skill and knowledge. We are lucky to have our own mold makers who fulfills the job over 20 years.

Product Application Field

Office chair,Office Supplies

Main Challenges

PVC corrosion mold: S136 heat treatment is adopted to increase the hardness and corrosion resistance of the die;

PP chair keel shrinkage: Due to the thick wall thickness of chair keel, PP material is easy to shrink, we first thinned the wall thickness of the keel, and then we added keel ribs to increase the strength of the product. In fact, we add a certain proportion of glass fiber to PP material to increase the strength effect, and appropriately add a certain amount of calcium sulfate and toughening agent to ensure that the product is not easy to shrink and the fluidity of the material can maintain the original properties.

Chair assembly coordination: Before developing the mold, we first processed some samples with a 3D printer, assembled and adapted them, and found out the corresponding problem points, so as to change the design scheme. Before the mold design, we also conducted mold flow analysis on the product, and have used SolidWorks to test the assembly and adaptation details of the product.

The customer designed to use ABS at the wear position of the Department. After test, discussion and negotiation with the customer, the ABS material was replaced with POM material, so that the product has better wear resistance and ensures the service life of plastic office chairs. It has been recognized by customers.
Material replacement:

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1300*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 7 pcs
Mold Quantity: 6 sets
Number of Processed Sliders: 12 pcs
Mold Material: S136, NAK80, P20, 718, 45#, etc.
Part Material: PVC, PP+GF, POM
Project Leader: Ken Yeo

Key Words

PVC, PP+GF, Air Trap, Shrinkage, SolidWorks


Product detail pictures:

Short Lead Time for Plastic Moulding Machine Manufacturers -
 Office Chair Back – Uni-Moulding detail pictures


Related Product Guide:

Sticking to your belief of "Creating solutions of high quality and generating buddies with people from all around the world", we always put the fascination of customers to start with for Short Lead Time for Plastic Moulding Machine Manufacturers - Office Chair Back – Uni-Moulding , The product will supply to all over the world, such as: Ghana , Australia , Swiss , Faced with the vitality of the global wave of economic integration, we've been confident with our high-quality items and sincerely service to all our customers and wish we can cooperate with you to create a brilliant future.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Ray from UAE - 2018.10.01 14:14
    This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
    5 Stars By Jack from Montpellier - 2018.09.12 17:18
    Write your message here and send it to us