• Background-1

Factory directly supply Clean Room Injection Moulding - Pole Slack Box – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

We constantly think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body along with the living for Mould Production, Medical Plastic Injection Mold, Gas Assisted Injection Molding, We believe you will be satisfied with our reasonable price, high quality products and fast delivery. We sincerely hope you can give us an opportunity to serve you and be your best partner!
Factory directly supply Clean Room Injection Moulding - Pole Slack Box – Uni-Moulding Detail:

case5

Pole Slack Box

Export Country:
South Africa

Completion Time:
1 Month

Tag: Plastic Injection Mold

Challange

Time schedule: The customer needed it to be finished within 30 days which is not a small mold and with many processes.  Especially for so many ribs to be EDM work.

Solutions

Several Machines are working for this tool to finish the job as fast as possible. We made it in time.

Product Application Field

Outdoor power equipment protection box. It mainly prevents the damage of ultraviolet and acid rain to outdoor power equipment and the pollution of power equipment by dust and mixture.

Story

Because the customer used the pole slack box are made of iron. The cost of iron sheet is high, and it is very easy to be corroded by acid rain, resulting in the product life not meeting the expected requirements. The customer once considered using stainless steel material, but after calculating the cost, he considered developing plastic molds and using PP material + UV. Termination cost to a certain extent, and it is firm and durable.

Main Challenges

The cost of iron sheet is high, and it is very easy to be corroded by acid rain, resulting in the product life not meeting the expected requirements. The customer once considered using stainless steel material, but after calculating the cost, he considered developing plastic molds and using PP material + UV. Termination cost to a certain extent, and it is firm and durable.

Because the product is large, the structure belongs to anisotropic structure, and the wall thickness is about 3mm, the conventional design is easy to shrink and deform. Although we have improved the materials, which can reduce certain shrinkage and deformation, the long processing cycle leads to the increase of production cost. Through the efforts of the design and R & D part, we finally reduced the processing time and cost by increasing the size of the gate inlet and adjusting the cooling system and reducing the cooling time and glue injection time.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PP+UV
Project Leader: Ken Yeo


Product detail pictures:

Factory directly supply Clean Room Injection Moulding - Pole Slack Box – Uni-Moulding detail pictures


Related Product Guide:

To fulfill the customers' over-expected satisfaction , we have now our strong crew to provide our greatest general assistance which incorporates promoting, gross sales, planning, creation, top quality controlling, packing, warehousing and logistics for Factory directly supply Clean Room Injection Moulding - Pole Slack Box – Uni-Moulding , The product will supply to all over the world, such as: Ukraine, luzern, Riyadh, We've been adhering to the philosophy of "attracting customers with the best items and excellent service". We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Daniel Coppin from Vancouver - 2018.11.22 12:28
    The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Teresa from Iraq - 2017.08.16 13:39
    Write your message here and send it to us